[Oct-2022]
HARP2 Team conducts integration and test: Flight HARP2 Electrical Integration to SpaceCraft Procedure.
[Oct-2022]
Install Flight HARP2 to PACE Spacecraft +Y Panel; Quick photos of HARP2 Mechanical Integration onto PACE ...
MORE »
[Oct-2022]
TV/TB Test of HARP2 Instrument; HARP2 calibration testing Setup with red light stills and video.
[Sep-2022]
HARP2 calibration testing setup inGSFC Bldg 33; TV/TB Test of HARP2 Instrument.
[Aug-2022]
Transporting HARP2 polarimter to thermal vacuum chamber.
[Aug-2022]
HARP2 polarimeter installed in chamber for pre-thermal testing.
[Aug-2022]
Preparing HARP2 polarimeter for thermal vaccum testing.
[Aug-2022]
Installating HARP2 polarimeter on thermal vacuum plate.
[Dec-2021]
Ground system equipment setup for boresight alignment of HARP2 polarimeter.
[Dec-2021]
Group photo with HARP2 polarimeter.
[Dec-2021]
Reviewing data from the boresight alignment of HARP2 polarimeter.
[Dec-2021]
Ground system equipment setup for boresight alignment of HARP2 polarimeter.