HARP2

View Slideshow »
[Oct-2022] HARP2 Team conducts integration and test: Flight HARP2 Electrical Integration to SpaceCraft Procedure.
[Oct-2022] Install Flight HARP2 to PACE Spacecraft +Y Panel; Quick photos of HARP2 Mechanical Integration onto PACE ... MORE »
[Oct-2022] TV/TB Test of HARP2 Instrument; HARP2 calibration testing Setup with red light stills and video.
[Sep-2022] HARP2 calibration testing setup inGSFC Bldg 33; TV/TB Test of HARP2 Instrument.
[Aug-2022] Transporting HARP2 polarimter to thermal vacuum chamber.
[Aug-2022] HARP2 polarimeter installed in chamber for pre-thermal testing.
[Aug-2022] Preparing HARP2 polarimeter for thermal vaccum testing.
[Aug-2022] Installating HARP2 polarimeter on thermal vacuum plate.
[Dec-2021] Ground system equipment setup for boresight alignment of HARP2 polarimeter.
[Dec-2021] Group photo with HARP2 polarimeter.
[Dec-2021] Reviewing data from the boresight alignment of HARP2 polarimeter.
[Dec-2021] Ground system equipment setup for boresight alignment of HARP2 polarimeter.