Jumbo Content

GSFC Clean Room


Unbolting the OCI ETU OM from the Lisard GSE in preparation for a crane lift move to the Instrument Structure. Protective contamination bagging is installed.
Download this image (JPG, 711 KB).
[11-Dec-19] Unbolting the OCI ETU OM from the Lisard GSE in preparation for a crane lift move to the Instrument Structure. Protective contamination bagging is installed.