Slideshow Gallery
Ocean Color Instrument
View Slideshow »[Aug-2022]
The Ocean Color Instrument team evaluates the instrument configuration in the Thermal Vacuum Chamber (TVA ... MORE »
[Aug-2022]
The Ocean Color Instrument team pushes the instrument into the Thermal Vacuum Chamber (TVAC) for environm ... MORE »
[Aug-2022]
The flight Ocean Color Instrument is installed in the Thermal Vacuum Chamber (TVAC) for environmental tes ... MORE »
[Aug-2022]
The Ocean Color Instrument is installed in the Thermal Vacuum (TVAC) chamber and prepared for thermal tes ... MORE »
[Aug-2022]
Mechanical technicians crane lift the Ocean Color Instrument on to the Thermal Vacuum Chamber (TVAC) cart ... MORE »
[Aug-2022]
Quality engineer Luiz Mendez observes mechanical technician Tyere Garner remove bolts before lifting the ... MORE »
[Aug-2022]
Mechanical technicians crane lift the Ocean Color Instrument from the Multi-purpose Ground Support Equipm ... MORE »
[Aug-2022]
Mechanical engineer, Eduardo Rodriguez, and Mechanical Technician, Joe Eddy, prepare the vertical lift sl ... MORE »
[Aug-2022]
Ocean Color Instrument Team poses with the flight instrument behind them in a cleanroom tent on August 4, ... MORE »
[Aug-2022]
Eric Gorman & Robby Estep pose with the instrument and integrated earth shade and Tilt fixture in the aco ... MORE »
[Aug-2022]
Ocean Color Instrument managers (Brian Clemons, Eric Gorman, Ulrik Gliese, Leland Chemerys, Joe Knuble, R ... MORE »
[Jul-2022]
The Earth Shade (ES) radiators on the Ocean Color Instrument are displayed as it is tested in a cleanroom ... MORE »
[Jul-2022]
Technician Nathan Allen connects the purge line to the Ocean Color Instrument in preparation for X-Axis ( ... MORE »
[Jul-2022]
Ocean Color Instrument mechanical team poses with the bagged instrument behind them after a successful en ... MORE »
[Jul-2022]
Mechanical technicians transport the Ocean Color Instrument through the integration and testing complex t ... MORE »
[Jul-2022]
The Ocean Color Instrument mechanical team stands on the balcony overlooking the bagged instrument after ... MORE »
[Jul-2022]
The Ocean Color Instrument mechanical team poses with the bagged instrument after successfully installing ... MORE »
[Jul-2022]
The GSFC environmental testing team poses with the bagged Ocean Color Instrument in the acoustic chamber ... MORE »
[Jul-2022]
Mechanical technicians crane lift the Ocean Color Instrument with Earth Shade onto the Flight Tilt Mechan ... MORE »
[Jul-2022]
The Ocean Color Instrument integrated onto the Flight Tilt Mechanism with the Earth Shade.
[Jun-2022]
The Ocean Color Instrument is prepared for environmental testing with installed thermal blankets, protect ... MORE »
[Jun-2022]
The Ocean Color Instrument (OCI) is prepared for environmental testing with installed thermal blankets an ... MORE »
[Jun-2022]
The Ocean Color Instrument (OCI) team poses with OCI and its integrated Earth Shade in June 2022 at Godda ... MORE »
[Jun-2022]
The Ocean Color Instrument Electro-Magnetic Interference (EMI) & Electrical Ground Support Equipment (EGS ... MORE »
[Jun-2022]
The Ocean Color Instrument Electro-Magnetic Interference (EMI) Team pose in the EMI cleanroom at Goddard ... MORE »
[Jun-2022]
The Ocean Color Instrument is prepared for testing in the Electro-Magnetic Interference (EMI) chamber sho ... MORE »
[Jun-2022]
The Ocean Color Instrument is prepared for testing in the Electro-Magnetic Interference (EMI) chamber.
[Jun-2022]
The Ocean Color Instrument Earth Shade (ES) is removed from a thermal chamber after successful testing.
[Jun-2022]
The GSFC Trax team lifts the Ocean Color Instrument on a forklift into a truck to transport to the integr ... MORE »
[Jun-2022]
Systems engineer, Joseph Knuble, adjusts the intensity of the studio lamp during the Ocean Color Instrume ... MORE »
[Jun-2022]
Systems engineer, Joseph Knuble, adjusts the intensity of the studio lamp during the Ocean Color Instrume ... MORE »
[May-2022]
Mechanical technician, Thomas Huber, integrates the Short Wave Infrared (SWIR) Pulse Calibration Assembly ... MORE »
[May-2022]
Manufacturing engineer, Roman Nilov, supervises the integration of the Short Wave Infrared (SWIR) Pulse C ... MORE »
[Apr-2022]
The Flight Ocean Color Instrument is installed onto the Ground Support Equipment Application for Tilt or ... MORE »
[Apr-2022]
Mechanical Technicians Daniel Dizon and Joseph Eddy transport the Ocean Color Instrument Earth Shade into ... MORE »
[Apr-2022]
Mechanical Technicians Daniel Dizon and Joseph Eddy install the Ocean Color Instrument Earth Shade into t ... MORE »
[Mar-2022]
Mechanical technician Joseph Eddy and mechcanical engineer Peter Steigner install the Ocean Color Instrum ... MORE »
[Mar-2022]
Mechanical Technician, John Poulsen, installs flight hardware during the Ocean Color Instrument post Opti ... MORE »
[Mar-2022]
Mechanical Engineer Paul Dizon and Mechanical Technician Daniel Dizon with the Ocean Color Instrument.
[Mar-2022]
Time-lapse video of closing +Y Panel and opening -Y Panel on PACE Spacecraft at NASA Goddard Spaceflight ... MORE »
[Mar-2022]
Mechanical technician Andrew Scharmann aligns the Ocean Color Instrument Focal Plane Assemblies (FPAs).
[Feb-2022]
Mechanical technician Andrew Scharmann stabilizes harnesses while Daniel Dizon rotates the Ocean Color In ... MORE »
[Jan-2022]
Paula Cain and Aldine Joseph-Pierre apply thermal blanketing to the Ocean Color Instrument Loop Heat Pipe ... MORE »
[Jan-2022]
Electrical harnesses are installed and prepped for electronic box integrations on the Ocean Color Instrum ... MORE »
[Jan-2022]
Mechanical technician Daniel Dizon stabilizes the Ocean Color Instrument Optical Module after a rotation ... MORE »
[Jan-2022]
Mechanical technicians reorient the Ocean Color Instrument Optical Module on the rotation fixture for add ... MORE »
[Jan-2022]
Members of the Ocean Color Instrument Main Optics Sub Bench (MOSB) integration team pose with the hardwar ... MORE »
[Jan-2022]
Mechanical technician Joseph Eddy guides the Ocean Color Instrument Main Optics Bench (MOB) to the LISARD ... MORE »
[Jan-2022]
Blanket technicians discuss thermal templates on the Ocean Color Instrument Instrument Deck Structure (ID ... MORE »
[Dec-2021]
Optical engineer, David Kubalak, inspects the Ocean Color Instrument Main Optics Sub Bench (MOSB) interio ... MORE »
[Dec-2021]
The Ocean Color Instrument Optical Alignment team poses for a group photo after successful alignment of t ... MORE »
[Sep-2021]
Aerospace Engineer, Daniel Senai, inspects the completed Ocean Color Instrument Solar Calibration Assembl ... MORE »
[May-2021]
The optical alignment team performs gravity sag measurements on the Ocean Color Instrument Main Optics Su ... MORE »
[Apr-2021]
Optical technician Timothy Hahn measures the Ocean Color Instrument Collimator Slit Bracket on the Coordi ... MORE »
[Mar-2021]
Technicians mechanically integrate the Shortwave Infrared (SWIR) Detector Assembly into the Ocean Color I ... MORE »
[Feb-2020]
The OCI ETU rolls into the TVAC chamber. Lines are for electrical connections, temperature sensors, accel ... MORE »
[Feb-2020]
The OCI ETU rolls into the TVAC chamber. Lines are for electrical connections, temperature sensors, accel ... MORE »
[Feb-2020]
The OCI ETU rolls into the TVAC chamber. Lines are for electrical connections, temperature sensors, accel ... MORE »
[Feb-2020]
Quality Assurance (QA) Engineer Brad Weideman witnesses the OCI ETU hardware installation.
[Jan-2020]
Beauty photo of the ETU OCI installed on the GSE Application for Tilt or Rotation (GAToR).
[Jan-2020]
Mechanical installation of the Data Acquisition Unit (DAU) electronics box onto the OCI ETU.
[Dec-2019]
The OM on Lisard GSE. Lift shackles are installed in preparation for an upcoming crane lift.
[Dec-2019]
Unbolting the OCI ETU OM from the Lisard GSE in preparation for a crane lift move to the Instrument Struc ... MORE »
[Dec-2019]
Crane lift of the ETU OM onto the OCI Primary Structure. (In order to protect the OM from potential parti ... MORE »
[Nov-2019]
MicroLens Array (MLA) and Fiber Optic Bundle attached to the OCI Optical Module (OM) during alignment and ... MORE »
[Nov-2019]
Alignment of the MLA and Fiber Optic Bundle to the OCI OM. The OM is located in the middle of the optical ... MORE »
[Nov-2019]
Joe Thomas and Alejandro Rodriguez Perez perform alignment of the MLA and Fiber Optics Bundle to the OCI ... MORE »
[Nov-2019]
The MOB attached to the Lisard Ground Support Equipment (GSE), prior to installation of the Main Optics S ... MORE »
[Oct-2019]
Ocean Color Instrument (OCI) ETU FlatSat End-to-End Electrical System Test - LTU Electrical Integration.
[Oct-2019]
Andrei Sushkov operating the OLAF-2 Goddard Laser for Absolute Measure of Radiance source bench (green li ... MORE »
[May-2019]
Installation of the ETU Rotating Telescope mechanism into the main optical bench structure.
[Aug-2018]
A NASA technician installs an optic reference cube to the HAM mechanism in order to perform alignment mea ... MORE »
[Aug-2018]
Installation of an optical cover to prevent any debris from contaminating the HAM mechanism optics.
[Jul-2018]
A NASA technician assembles the Half-Angle Mirror (HAM) mechanism in preparation for balancing activities ... MORE »
[Jul-2018]
NASA technician, Wes Fincher, installs a temporary vibration sensor to prepare the ETU Rotating Telescope ... MORE »
[Jun-2018]
Setting up the Engineering Test Unit (ETU) for spindle axis characterization in order to measure the true ... MORE »
[May-2018]
Performing BOLT vibration testing. A contamination cover is installed to protect the hardware from debris ... MORE »
[May-2018]
A NASA technician installs the rotor mass simulator to the Bearing Only Life Test (BOLT) unit in preparat ... MORE »