[Jan-2024]
PACE Propellant Loading and Pressurization Procedure at Astrotech (Red Tag/Green Tag).
[Jan-2024]
PACE Propellant Loading and Pressurization Procedure at Astrotech (Red Tag/Green Tag).
[Dec-2023]
Tracking and Delay Relay Satellites (TDRS) test photos. Launch Site integration and test: TDRS Live Sky a ...
MORE »
[Nov-2023]
PACE Observatory on Dolly at Astrotech during Launch Campaign. Launch Site integration and test: Lift Obs ...
MORE »
[Nov-2023]
Mechanical Team Photo in front of PACE Observatory on Dolly at Astrotech during Launch Campaign.
[Nov-2023]
Launch Site integration and test. Lift Observatory to Aronson Table, Rotate for investigation, Lift Back ...
MORE »
[Nov-2023]
Launch Site integration and test. Lift Observatory to Aronson Table, Rotate for investigation, Lift Back ...
MORE »
[Nov-2023]
PACE observatory’s arrival at Astrotech.
[Nov-2023]
PACE observatory’s arrival at Astrotech.
[Nov-2023]
PACE Observatory transport to Astrotech.
[Nov-2023]
Glamour photo of PACE in the Spacecraft Checkout Area prior to shipment to Astrotech.
[Oct-2023]
Glamour photo of PACE in the Spacecraft Checkout Area prior to shipment to Astrotech.
[Oct-2023]
Glamour photo of PACE in the Spacecraft Checkout Area prior to shipment to Astrotech.
[Oct-2023]
Glamour photo of PACE in the Spacecraft Checkout Area prior to shipment to Astrotech.
[Oct-2023]
Glamour photo of PACE in the Spacecraft Checkout Area prior to shipment to Astrotech.
[Jul-2023]
PACE Observatory thermal vacuum testing: Configure for Thermal Vacuum Test (Chamber Break); HARP2 sphere ...
MORE »
[Jun-2023]
Observatory integration and test: Walkdown Observatory Space Environment Simulator Chamber and Ground Sup ...
MORE »
[Jun-2023]
Observatory integration and test: Walkdown Observatory Space Environment Simulator Chamber and Ground Sup ...
MORE »
[Jun-2023]
Observatory integration and test: Walkdown Observatory Space Environment Simulator Chamber and Ground Sup ...
MORE »
[Jun-2023]
Observatory integration and test: Walkdown Observatory Space Environment Simulator Chamber and Ground Sup ...
MORE »
[Jun-2023]
Stage the Observatory outside the Space Environment Simulator Chamber 290; Move Observatory to the Chamb ...
MORE »
[Jun-2023]
Lift the Observatory into the Space Environment Simulator (SES) Chamber; PACE Observatory thermal vacuum ...
MORE »
[Jun-2023]
Lift the Observatory into the Space Environment Simulator (SES) Chamber; PACE Observatory thermal vacuum ...
MORE »
[May-2023]
Lift Observatory to Aronson Table. Rotate for Flight Solar Array Wing Removal and Lift Back to Observator ...
MORE »
[May-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Removal and Lift Back to Observator ...
MORE »
[May-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Removal and Lift Back to Observator ...
MORE »
[May-2023]
Lift Observatory to Aronson Table. Rotate for Flight Solar Array Wing Removal and Lift Back to Observator ...
MORE »
[Mar-2023]
Final spacecraft configuration in Spacecraft Checkout Area (SCA). Prep, bag and move the Observatory to S ...
MORE »
[Feb-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Installation and Phasing Tests, Lif ...
MORE »
[Feb-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Installation and Phasing Tests, Lif ...
MORE »
[Feb-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Installation and Phasing Tests, Lif ...
MORE »
[Feb-2023]
Lift Observatory to Aronson Table, Rotate for Flight Solar Array Wing Installation and Phasing Tests, Lif ...
MORE »
[Feb-2023]
Lift to Aronson Table, Rotate for Flight Solar Array Wing Removal, Lift Back to Observatory Dolly; Cleani ...
MORE »
[Feb-2023]
Final configuration in chamber prior to door closing & Hot Soak; Solar Array engineering test unit Wing P ...
MORE »
[Feb-2023]
Final configuration in chamber prior to door closing & Hot Soak; Solar Array engineering test unit Wing P ...
MORE »
[Feb-2023]
Solar Array enginnering test unit Wing Pop and Catch Thermal Vacuum Test; Replace NEAs, Preload, tethers, ...
MORE »
[Feb-2023]
PACE Observatory Glamour Photos in electromagnetic interference (EMI) Chamber; Move Observatory to EMI: I ...
MORE »
[Jan-2023]
Partial +Y Panel Opening; Open and Close the +Y Panel.
[Oct-2022]
PACE Mechanical Team with the spacecraft.
[Oct-2022]
Candid and portrait photos of the PACE Mission Operations Center.
[Oct-2022]
Install Earth Coverage Antenna (ECA) and Temporary Install Waveguides to PACE Spacecraft BUS; ECA and Hat ...
MORE »
[Aug-2022]
The red object is known as a "hat," which shields PACE’s Earth coverage antenna and prevents emissi ...
MORE »
[Jul-2022]
Thermal vacuum test of Ka-band Earth coverage antenna.
[Jul-2022]
Thermal vacuum test of Ka-band Earth coverage antenna.
[Jun-2022]
Radiofrequency testing setup after spacecraft vibration test.
[Jun-2022]
Setting up for radiofrequency testing.
[Jun-2022]
Ocean Color Instrument time lapse video showing the integration and build up of hardware from April 2021 ...
MORE »
[Jun-2022]
PACE Control room.
[Jun-2022]
PACE Control room.
[Jun-2022]
Lifting Structural Verification Unit out of chamber for the Sine Vibration Test.
[Jun-2022]
Installing Low Gain Antenna on PACE Spacecraft bus.
[May-2022]
Aligning the solar arrays and Structural Verification Unit to perform electrical tests.
[May-2022]
Lifting PACE Structural Verification Unit onto Aronson Table for engineering tests.
[May-2022]
Opened -Y Panel.
[May-2022]
Installing bus Star Tracker Sensor on the PACE -Z Panel.
[May-2022]
Installing the bus Star Tracker Sensor on the -Z Panel.
[May-2022]
Installing Star Tracker Sensor on the -Z Panel.
[May-2022]
Inspecting the PACE Star Tracker Sensor.
[Apr-2022]
Inspection and electrical testing of PACE Flight Solar Array Panels.
[Apr-2022]
Alignment team working on the PACE spacecraft.
[Apr-2022]
Alignment team working on the PACE spacecraft.
[Apr-2022]
Testing solar array drive assembly on PACE spacecraft bus.
[Apr-2022]
Installing the solar array drive assembly on the PACE spacecraft bus.
[Apr-2022]
Overall photos of spacecraft after solar array drive assembly install.
[Apr-2022]
PACE spacecraft team checking alignment data.
[Apr-2022]
PACE engineering test unit for solar array drive assembly wing setup.
[Apr-2022]
PACE engineering test unit for solar array drive assembly walkouts on the gantry.
[Apr-2022]
Tightening bolts on the PACE engineering test unit solar array drive assemblies wing setup.
[Apr-2022]
Measuring PACE engineering test unit solar array drive assemblies wing setup.
[Apr-2022]
Carlos Duran-Aviles with the PACE reaction wheel assembly.
[Mar-2022]
The Optical Module (OM) and the Flight Instrument Deck Structure (IDS) are integrated together, creating ...
MORE »
[Mar-2022]
Performing component functional testing on the PACE spacecraft.
[Mar-2022]
Members of PACE spacecraft integration and test team.
[Mar-2022]
Open panel (-Y) on spacecraft bus. Blue electronics boxes are for power system and attitude control elect ...
MORE »
[Mar-2022]
Installing qual battery on flight spacecraft bus.
[Feb-2022]
Panel (-Y) being installed on the spacecraft structure.
[Feb-2022]
Panel (-Y) being installed on the spacecraft structure.
[Feb-2022]
PACE spacecraft bus structure.
[Feb-2022]
Assembling PACE spacecraft bus structure.
[Feb-2022]
Panel (+Y) installed on the PACE spacecraft bus.
[Feb-2022]
Installing panel (+Y) on the PACE spacecraft bus.
[Feb-2022]
Assembling PACE spacecraft bus structure. Propulsion tank is in the middle.
[Feb-2022]
View inside the PACE spacecraft bus structure.
[Feb-2022]
Installing the top of the PACE spacecraft bus structure.
[Feb-2022]
Checking the top of the PACE spacecraft bus structure.
[Feb-2022]
Installing of panel (-Z) onto the PACE propulsion module deck.
[Feb-2022]
Panel (-Z) installed on the PACE propulsion module deck.
[Feb-2022]
PACE spacecraft bus structure with -Z panel on propulsion module deck.
[Feb-2022]
Assembling PACE spacecraft bus (+Z and -Z panels) using keel lift.
[Feb-2022]
Installing the passive ring and propulsion module onto the PACE observatory dolly.
[Feb-2022]
Lifting points proof test for spacecraft transport between facilities.
[Jan-2022]
PACE assembly for structural testing.
[Jan-2022]
Installing torque circular connectors during panel integration.
[Dec-2021]
Performing electrical integration of engineering test unit’s Ka-band transmitter.
[Dec-2021]
Electrical integration of engineering’s test unit Ka-band transmitter.
[Dec-2021]
PACE Team / Group photo December 2021.
[Oct-2021]
PACE solar array deployment gantry.
[Oct-2021]
PACE solar array deployment gantry.
[Oct-2021]
Installing tilt and solar array drive electronics to a PACE spacecraft panel (-Y).
[Oct-2021]
Installing GPS receiver box to a PACE spacecraft panel (-Z).
[Oct-2021]
Installing stimulators on PACE course sun sensors.
[Oct-2021]
Performing electrical integration of flight power system electronics and attitude control electronics box ...
MORE »
[Sep-2021]
Lift fixture within thermal vacuum chamber.
[Sep-2021]
Installed multilayer insulation thermal blankets on PACE propulsion module.
[Jun-2021]
Qualification of the spacecraft bus structure strength.
[Jun-2021]
Installing the flight propellant tank into the frustum.
[Jun-2021]
Assembling the structure, installing the mass simulators and tilt platform/solar array strength test fixt ...
MORE »
[Jun-2021]
Inspecting attitude control electronics box telemetry for fluctuations registered during testing.
[May-2021]
Testing observatory lifting points and pull strength of tilt platform, solar array, SPEXone, HARP2, and b ...
MORE »
[May-2021]
Lift of PACE spacecraft into the testing modal facility.
[May-2021]
Spacecraft structure with mass simulators, tilt platform & solar array strength test fixtures.
[May-2021]
Mass simulation assembly structure. Install of tilt platform/solar array strength test fixtures.
[Oct-2020]
Thermal integration of PACE propulsion tank.
[Aug-2020]
Inertial reference unit electromagnetic interference testing procedure.
[Mar-2020]
Installing the ETU SDA onto the Turnover Dolly.
[Mar-2020]
NASA Technician Andrew Scharmann verifies correct spring deflection to properly preload the depolarizer o ...
MORE »
[Mar-2020]
ETU SDA Post Delivery Acceptance Testing side view.
[Mar-2020]
ETU SDA Post Delivery Acceptance Testing front view.
[Mar-2020]
ETU SDA in its shipping container for post delivery to Goddard Space Flight Center.